The Sewer Waterway
From Path of Exile Wiki
Revision as of 23:20, 25 July 2022 by Vinibot (talk | contribs) (→Version history: Give the changes text to Template:Version history table row as an argument instead of floating it between templates.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
This article describes historical game content.
The Sewer Waterway was removed in Version 2.0.0 due to zone progression rebalancing.
The Sewer Waterway is a former area in Act 3.
This area was connected to The Ebony Barracks and The Warehouse Sewers.
Monsters
Guests:
Version history
Version | Changes |
---|---|
2.0.0 |
|